Putting AQL Defect Limits in the Purchase Order: A Contract Template
A purchase order that says "good quality" cannot enforce anything; it becomes an argument about opinion. This guide turns quality into contract language: state the AQL standard (critical 0 / major 2.5 / minor 4.0 per ISO 2859-1, Level II), attach a measurable product-spec annex, make a third-party inspection report with timestamped photo logs the payment gate, and put rework and re-inspection on the supplier after a failure. A paste-ready clause set is included.
Nov 1,2026